Showing posts with label
Planned availability date has been changed for IBM i 7.5 TR 9 and IBM i 7.6 TR 3.
Show all posts
Showing posts with label
Planned availability date has been changed for IBM i 7.5 TR 9 and IBM i 7.6 TR 3.
Show all posts
November 25, 2026
The planned availability date for IBM i 7.6 TR3 and IBM i 7.5 TR 9 updates have been changed from 11/20/2026 to 12/4/2026.
The link to the announcement can be found here