Showing posts with label Planned availability date has been changed for IBM i 7.5 TR 9 and IBM i 7.6 TR 3. Show all posts
Showing posts with label Planned availability date has been changed for IBM i 7.5 TR 9 and IBM i 7.6 TR 3. Show all posts

Planned availability date has been changed for IBM i 7.5 TR 9 and IBM i 7.6 TR 3

 
November 25, 2026

The planned availability date for IBM i 7.6 TR3 and IBM i 7.5 TR 9 updates have been changed from 11/20/2026 to 12/4/2026. 

The link to the announcement can be found here